Isfahan Metro is an urban rapid-transit system, distinct from the national railway used for intercity journeys. Its principal operating corridor crosses the city from Qods in the north towards Defa-e Moqaddas, also known as Soffeh, in the south. A report quoting the operating company’s chief executive described Line 1 as approximately 20 kilometres long, with 20 active stations. These are a dated description of the operating line, rather than measurements of every proposed extension. s2
The alignment helps explain the railway’s urban role. UrbanRail describes a route through the centre along Chaharbagh Boulevard, connecting the areas of the Kaveh and Soffeh intercity bus terminals. The metro therefore serves an internal city corridor while also bringing urban rail close to longer-distance road transport. This relationship does not make a metro ticket an intercity ticket, nor establish coordinated connections between the services. s1
[s1] [s2]A line assembled in stages
The railway emerged through successive openings. UrbanRail’s chronology records the Qods–Shohada section opening in October 2015, an extension to Takhti in November 2016, a further extension to Azadi in July 2017, and the southern extension to Soffeh in July 2018. Its record also identifies stations added within previously opened sections. A line’s inauguration date consequently does not establish that its eventual route and every station were available from the beginning. s1
The same source retains earlier construction expectations alongside later opening dates. This makes it useful for understanding the project’s evolution, but unsuitable as a stand-alone statement of today’s timetable. Its introductory narrative and detailed chronology also differ over the month of the initial opening; October follows the dated chronology and requires confirmation against an original operator record. s1
[s1]Construction is not passenger operation
In a report dated 8 Dey 1404 in the Iranian Solar Hijri calendar, municipal rail officials described Line 2 as an unfinished project running from the northeastern Darak area through central Isfahan towards Khomeinishahr. They said trial operation of an initial section depended on obtaining trains, with the national government and Interior Ministry responsible for fleet provision. The announced opening target was a prospective commitment, not evidence that service subsequently began. s2
A later transport-news report continued to describe Line 2 construction and identified Imam Hossein as the intended intersection with Line 1. It also reported efforts to reduce peak-hour intervals on the operating line. Read together, these accounts show why tracks, stations, trains and service frequency need separate treatment: progress in one does not automatically establish readiness in the others. A dated operator notice confirming the extent of public service is still needed before publishing a current transfer guide. s3
[s2] [s3]Sources & research notes
- [s1] Isfahan MetroUrbanRail.Net / Robert Schwandl · System; History; Projects · Accessed 2026-10-28
- [s2] The first phase of Metro Line 2 is expected to enter trial operation by year-endTasnim News Agency · Dated 8 Dey 1404; statements by Mehdi Ruholamin and Hadi Karimi on Line 2, fleet provision and Line 1 operations · Accessed 2026-10-28
- [s3] Reduction in Isfahan Metro train intervals during peak hoursNavgan News · Indexed article text concerning operating intervals, Line 1 and the intended Imam Hossein interchange; full-page retrieval timed out · Accessed 2026-10-28
limitations
- Research was conducted on 2026-10-28 for a cutoff of 2026-10-26; source access dates are not backdated.
- No current operator service notice was inspected.
- The Navgan article was inspected through indexed text; full-page retrieval timed out.
- The source publication date expressed as 8 Dey 1404 is retained in the locator without an unverified Gregorian conversion.
unverified items
- Line 2 passenger-service status on the cutoff date.
- Current operating hours, fares, accessibility provisions and station-specific service.
- The precise initial opening date against an original operator announcement.
data gaps
- No comparable annual ridership series with reporting calendars and counting methodology was retrieved.
- Isolated daily or annual passenger claims were not converted into a time series.
coverage period
Historical development from 2015 to 2018, supplemented by later operating and construction reports available before the cutoff.